Procurement is a chain, not a purchase order.

Five services that can be bought separately and are designed to be run together — so nothing falls between the supplier, the forwarder, the broker and the site.

Core business

What we take responsibility for.

From the first supplier shortlist to the last signed delivery note, the same team owns the outcome.

01

Full-chain supply chain planning

Diagnose before you buy

Before a single order is placed, we map how the material actually has to move: what is bought where, which items are long-lead, which routes are exposed, and where a delay would stop the project. The output is a chain design, not a quotation.

Planning continues while the project runs. Demand changes, suppliers slip and routes close — the plan is re-cut against the delivery date rather than against last month's forecast.

  • Supply chain diagnosis and process optimisation
  • Resource allocation across suppliers and hubs
  • Risk early warning and exposure mapping
  • Emergency and contingency plan formulation
02

Cross-border procurement & control

From supplier list to signed-off goods

We screen suppliers, run the bidding and negotiation, place and follow the order, and control quality before cargo leaves the factory. For high-value, customised and large-scale project cargo, the control points are agreed up front and documented.

Multi-currency settlement and procurement reconciliation are handled in the same service, so commercial paperwork does not become a second supply chain.

  • Global supplier screening and qualification
  • Bidding, negotiation and order follow-up
  • Specification matching and quality control
  • Multi-currency settlement and reconciliation
03

Warehousing & inventory management

One roof for mixed project cargo

Our 1,600 m² self-owned warehouse is zoned by cargo type — industrial spare parts, oils, safety supplies and site living supplies — with moisture-proof and anti-theft controls. Mixed consignments can be received, checked, packed, reinforced and loaded in one place.

Inventory is managed dynamically: shortages and overstock are flagged before they become a site problem, and fast-moving consumables can be held as safety stock at the hub.

  • Customised warehousing and zoning
  • Sorting, packing and reinforcement
  • Dynamic inventory with shortage and overstock warnings
  • Fresh-keeping and constant-temperature storage
04

Project-based supply chain

The delivery date is the design brief

Large engineering, infrastructure and industrial projects do not buy catalogue items on a catalogue schedule. We coordinate the overall material plan, deliver equipment against the installation sequence, and manage the interface with the site team.

This is where the corridor matters: high-value equipment, bulk goods and urgent orders move through the same chain, with risk control built for complex environments.

  • Overall material coordination across packages
  • Equipment delivery against the site programme
  • On-site collaborative management
  • Urgent-order and emergency allocation
05

Consulting & training

Know the route, the rules and the risk

For teams building or repairing a cross-border supply chain, we provide industry trend analysis, compliance guidance and cross-border trade policy interpretation — grounded in live corridor experience rather than generic playbooks.

Team operation training is delivered against the customer's own process, so the handover from planning to daily execution is not a second project.

  • Industry supply chain trend analysis
  • Compliance guidance and policy interpretation
  • Team operation training
  • Process design for new corridors
Execution

How a project moves through us.

Eight steps, each with a named owner and a documented handover. The same sequence runs whether the cargo is a drill bit or a substation.

01
Brief & scopeBill of materials, destination, delivery date and the constraints that matter.
02
Sourcing & RFQSupplier shortlist, requests for quotation and commercial comparison.
03
Supplier auditCapability, specification and documentation checks before the order.
04
PO & paymentOrder placement, multi-currency settlement and progress follow-up.
05
QC & inspectionPre-shipment checks against the agreed specification and packing list.
06
Consolidation & docsZoned warehousing, packing, reinforcement and export documentation.
07
Freight & clearanceAir, sea or multimodal movement, with local clearance on arrival.
08
Delivery & reconciliationEscorted site delivery, proof of delivery and financial reconciliation.
Transport modes

Three speeds. One chain.

The mode is chosen per item and per consequence of delay — not per shipment.

ModeTransit to LagosBest forHow we run it
Express air 2–3 days Line-stopping spare parts and sudden equipment failures. Reserved capacity and priority handling; safety stock at the hub for repeat failures.
Regular air ~10 days Electronics, precision parts and smaller urgent consignments. Consolidated departures with pre-booked space for restricted and battery cargo.
Sea freight By sea Bulk consumables, heavy, extra-long and extra-wide project cargo. FCL or consolidated loads, with oversize handling and door-to-door escort on arrival.
Cartons staged in a distribution warehouse
Consolidation is where schedule risk is removed.

Multiple suppliers, one loading plan. Cargo is received against the purchase order, checked, packed for the route and loaded once — instead of arriving at the port as separate consignments with separate paperwork.

Guangzhou · Beijing · Hong Kong
What you receive

Before you commit, you get the numbers and the risk.

A supply plan is only useful if it can be challenged. Ours is written to be.

A route, a landed cost and a risk note — in writing, against your bill of materials.

We price the chain end to end: goods, consolidation, freight, clearance and delivery. Where a cost depends on a route or a classification, it is shown as a range with the condition that moves it.

The risk note names the items most likely to slip, the documentation that is easy to get wrong, and the mitigation we would put in place. If the date cannot be held, we say so before the order rather than after the vessel sails.

Landed costGoods, freight, clearance, delivery.
Route & modePer item, with transit windows.
Risk noteExposure, documentation, mitigation.

Send the list. We will send the route.

Bill of materials, destination and required-by date is enough to start.